"We built the whole building out of wood. The first reason was environmental, the second was constructive, since everything went through the basement of the parking lot, in a hole that was 3 meters by 2.5 meters high, so everything was brought in from below to be brought up behind the existing building... "
Sylvain Réty, Raphaël Renard, Julien Broussart, Mars Architectes
Sylvain Réty, Raphaël Renard, Julien Broussart, Mars Architectes